Do you pour concrete pads?

We can install our sheds on a pre-existing concrete pad; we do not pour concrete pads.

You can have a concrete pad poured by a local contractor or use a pre-existing concrete pad if it is verified to be level and squared. With this option the concrete becomes the interior floor of the shed rather than our standard wooden floor.

You can verify the pad is level using a bubble level tool and is square by measuring diagonally from corner to corner. Please feel free to contact us if you require assistance with this.

No comments yet.

Comment on this FAQ